GE Jenbacher | Gas Engine | Remote Monitoring | Diagnostics

By: Clarke Energy  05/12/2011
Keywords: Service Engineers, remote monitoring, Gas Engine

In order to optimise the performance of a generation facility, GE’s gas engines can be remotely linked to centralised monitoring stations.

Designated service engineers can be automatically notified about unscheduled generator stops such as engine trips via text message or e-mail.


  • Ability to monitor engine performance from different location
  • Optimised engine availability
  • Reduced site manpower requirements
  • Diagnosis of problems

Engine Monitoring

It is possible to monitor a variety of different engine performance parameters including:

  • Whether an engine is running
  • Availability (hours ran)
  • Electrical output (kW, kWh)
  • Gas quality when linked to gas detectors (CH4, O2, H2S)

It is also possible to provide trends in historical engine performance data.

Keywords: Gas Engine, gas engines, remote monitoring, Service Engineers,

Other products and services from Clarke Energy


GE Jenbacher | Gas Engine | Commissioning | Grid connection

Our service engineers are also able to support with grid synchronisation tests such as the G59 in the UK and G10 test in the Republic of Ireland. Please discuss your requirements with your local Clarke Energy office. Service engineers with site familiarity.


GE Jenbacher Maintenance Agreements | Clarke Energy

Site-based maintenance operatives can help ensure smooth operation of the installation and offers you the advantage of all services supplied from one single source – our experienced and well-trained Clarke Energy technicians. Clarke Energy is able to provide the highest levels of customer service and peace-of-mind with along with comprehensive long-term maintenance agreements.


GE Jenbacher gas engine training

Drawing on the many years of experience, our specialised trainers translate this deep product knowledge into an extensive training programme – one that is customisable based upon your specific gas engine’s application. Customers, service providers and other stakeholders can participate in our comprehensive training program in one of the GE Energy training centres, or directly on-site at a customer’s plant.


GE Jenbacher | Gas Engine | Upgrades | Repair | Overhaul

At the 60,000 hour overhaul ideally the engine will be taken away from the site to be stripped down and fully serviced with specialised machinery. Please speak to your local Clarke Energy office to determine whether there are any upgrades available for your generation equipment. Attendance for replacement of consumables such as oil and filters typically occurs every 1,000 – 2,000 operational hours.


GE Jenbacher | Gas Engine | Spare Parts | Parts Supply

Our warehouse stocks are managed by the latest in computer software which replenishes parts when a minimum stock level is reached, ensuring a rapid turnaround on 90% of purchase orders. Clarke Energy is the authorised supplier of genuine GE Gas Engine spare parts in the UK, Ireland, China, France, Algeria, India, Nigeria, Tunisia, Australia and New Zealand.