Ireland & UK Hardware

By: Eft  05/12/2011
Keywords: Control Systems, data collection, temperature meters

Ireland & UK Hardware

EFT Energy Manager™ primarily collects data from pulse, modbus or analogue signals through our range of Ethernet and GSM/GPRS data collection loggers.

EFT’s DataTrak™ (left) data collection logger gathers utility data in real time from electric, gas, water, steam and temperature meters over Ethernet networks or GSM/GPRS. Our solution provides “plug & play” technology that automatically detects and configures Modbus devices in seconds. Data from all downstream devices are time stamped and stored in non-volatile memory at user-selected intervals. This interval data can be stored or uploaded to the EFT Energy Manager V5.2 through a variety of formats including XML & CSV.The EFT Optimiser (below) is EFT's main Ethernet Data Logger delivering up to 6 months data logging capability and up to 72 digital or analogue inputs using 10/100 TCP/IP Communications.
.

The EFT Nano(below) is EFT Control Systems smallest real time Ethernet data collection controller with up to 6 months data logging capability and with 4 digital inputs.
.

Configuration
Energy Manager™ can be configured to collect data from utility meters on a single site and display locally on the site intranet. It can also be configured to collect data from multiple sites through a variety of data collection media and display the data from a central source.

Alternatively, business's can avail of EFT's fully hosted service. The benefits of this are that EFT fully host and manage the business's energy platform using best in breed technology (SQL Server,.NET 3.0).

Keywords: Control Systems, data collection, temperature meters

Other products and services from Eft

05/12/2011

AutoStart DATATrak

By using Energytracked, we have identified areas where potential savings can be made by implementing changes and energy reduction measures. Energytracked is proving to be an excellent system for AIB Bankcentre Headquarters, Dublin. Fiachra Crean, Engineering Services Department of AIB Reports.


05/12/2011

AutoStart Tridium

Cul Green is an exciting initiative between the GAA and ESB aimed at making Croke Park a Carbon Neutral Stadium. This was recommended to us by ESB Independent Energy as part of our Cul Green energy project. The Operations Manager of Croke Park Stadium, Mr Alan Gallagher, reports. We are delighted with the installation of Energytracked at our stadium.


05/12/2011

Control Energy Costs

EFT Energy Manager V5.2 is a superior web based enterprise energy management system that empowers businesses to measure, monitor and manage their energy consumption, carbon emissions and expense across all utilities in real time. Powerful Technology Energy Manager V5.2 combines the latest .Net software technology with the most advanced data collection hardware to give you state of the art tracking and reporting capability.


05/12/2011

Comprehensive, In-Depth Reporting

The Building Performance report allows for multi-site building comparisons that enable the user to easily identify comparative inefficiencies and therefore, optimize building performances against all KPI’s. The Energy League module creates meter benchmarking reports to highlight the performance of meter, meter aggregation or KPI’s within the company organization to highlight best performance.


05/12/2011

USA Hardware

EFT’s DataTrak™ Ethernet data collection logger gathers utility data in real time from electric, gas, water, steam and temperature meters over Ethernet networks or GSM/GPRS. This interval data can be stored or uploaded to the EFT Energy Manager V5.2 through a variety of formats including XML & CSV. Our solution provides “plug & play” technology that automatically detects and configures Modbus devices in seconds.


05/12/2011

Ireland & UK Metering

The KLIK System is very fast and cost effective to install, all connections are plug-in and pulse outputs can be wired in low grade cable up to distances of 1 km. Fitting is easy, supplies do not need to be isolated or cables disconnected and separate cubicles, panel cut outs and CT mounting kits are all unnecessary.